TECHNICAL SPECIFICATIONS
1. PRODUCTION OF HOT
WATER PER BOILER ON THE GROUND FUEL
Boiler on the ground with fuel CYTHIA EVOLUTION 1CH22, kit heating floor,
kit radiators kit probes ECS
Preparator ECS 75 L, groups safety and Anti valve
thermosiphon. The ECS feeds the sink located on the left (commun run at
the two sides)
Surge tank PNEUMATEX
Valve of safety 3 bar
Circulator ECS UPS 25-55
Fast connectors on exits meter of calories
Flowmeters water ECS and heating thermometers with dilation of liquid
0-100°C dial pressure gauges ø 100mm
Valves of balancing MT 3/4 (2)
Valves of balancing MT 1/2 (2)
Automatic drainers dielectric connections disconnecting chimney (2té +
purging + 2 length 1m) regulator of pulling
Tank fuel 30 L equipped with a reserve of measurement (see chart TAN 030) |
2. PRODUCTION Of HOT WATER PER MURAL
BOILER GAS
Mural boiler with chimney CENTORA 2.24CF GN, ECS
instantaneous outputting on the sink
Modulate heating floor THORIX and its regulation meter gas
Primary education circulator UPS 25-80
Fast connectors on exits (4) meter of calories flowmeter
Flowmeters water ECS and heating thermometers with dilation of liquid
0-100°C disconnecting
Valves of balancing MT 3/4 (2)
Valves of balancing MT 1/2 (2)
Automatic drainers
3. ELEMENTS COMMON TO BOTH CIRCUITS
Electrical equipment box (with glass casing of indication)
Water supply: winnow, filter, meter, disconnecting
Sink stainless with mixing valve
Thermometers (2)
Exchanger with plates
Fast connectors on exits exchanger
Fast connectors on flexible devices
Flexible devices of connection with connectors
Evacuation water used on PVC ø100 with exit ø32 |