DESCRIPTION

 

• The unit is composed of a traditional boiler (fuelled by oil, natural gas, other fuel)

• The boiler feeds two systems at two different temperatures, as well as producing warm water for domestic use.

• The TCF 200 can be connected to floor heaters, radiators, or an external unit heater by using quick hydraulic clutches.

• A part of the heat production can be diverted to an external unit heater through the use of two plate exchangers.
 

Teaching equipment : Heating System installation - TCF 200

 

• The warm water produced for domestic use is connected to a sink fixed on the unit.

• The unit is controlled through the RTC 100 regulator, which is included with the equipment.

• The unit is delivered with an instruction manual and is designed for energy engineering training.

TECHNICAL SPECIFICATIONS
 

1. FLOOR FUEL BOILER
2. FUEL TANK
3. TANK OF WARM WATER FOR DOMESTIC USE
4. RTC 100 TEST UNIT
5. SWITCH CUPBOARD
6. LOW TEMPERATURE CIRCUIT : DECOUPLING BOTTLE WITH MIX
7. HIGH TEMPERATURE CIRCUIT : DECOUPLING BOTTLE WITHOUT MIX
 

 

8. EXCHANGERS WITH PLATES (DISSIPATION) EXTERNAL UNIT HEATER
9. WATER TREATMENT CIRCUIT
10. PRIMARY CIRCUIT (CHARGING PUMP)
11. DISCONNECTOR – FILTER - COUNTER
12. MOBILE HEATER CIRCUIT (TCF 120)
13. MOBILE HEATING-FLOOR CIRCUIT (TCF 120)°
14. MOBILE UNIT HEATER (TCF 120)
15. EXTERNAL UNIT HEATER
16. FLEXIBLE CONNECTING WITH QUICK CLUTCHES (6)

 

PEDAGOGIC APPLICATIONS

 

Practical experience with real heating elements
- Selecting the equipment
- Installation
- Identifying the components and determining their function
- Starting
- Adjustment
- Balancing
- Preventive maintenance and solving problems
- Safety elements
- Water feeding – boiler water treatment
- Water expansion mechanism…

Using instrumentation provided
- Flow rate, pressure and temperature measurements
- Fuel Consumption
- Measurement of chimney gas emissions (option)
- Balancing with TA unit

Basic Concepts
- Heat transfer in a heater, in an exchanger with plates
- Heat power
- Heater power required for domestic warm water
- Balances
- Outputs
- Balancing
- Adjustment on 3-way valves (mix and division)…

Teaching equipment : Heating System installation - TCF 200 schema


Dimensions
Length : 8 m
Width : 1 m
Height : 2.3 m
Weight : 450 kg (without water)

Utilities
WATER : network 3 bars
ELECTRICITY : 230 V single phase
SMOKES : 1 chimney outlet Ψ 139 mm

Provide a drain for used water
All services must be within 2.5 m of the unit

Shipping
Packing size for each box:
(3 boxes)
Length : 2,5 m
Width : 0,88 m
Height : 2,4 m
Global weight : 300 kg


Options
The unit can be equipped with the following:
- Combustion analyser for chimney gases (with or without the NO and NO2 measurements)
- Contact thermometer
- Energy meter(s)
- Balancing with TA material (other brands on request).

 

 

 

 

Download this page in PDF :

Heating System installation


Didatec Technologie - ZA du Parc 42490 Fraisses -  France -   Tel : 33 (0)4 77 10 10 10 -  Fax : 33 (0)4 77 61 56 49   
E-Mail : didatec.technologie@wanadoo.fr