CRR 100 - Combined rankine and vapour compression refrigeration cycle
Need more information?
Contact us- To understand and trace thermodynamic cycles experimentally.
- Study of the Rankine cycle.
- Plot of combined cycles on enthalpic diagram.
- Calculation of the cooling capacities at the evaporator, at the condenser at the ejecto-compressor, as well as at the steam generator.
- Calculate the heat balances at the exchangers and the operating efficiencies.
- Calculation of the efficiencies.
- Boiler
Volume 0,68 l
Liquid pre-heater, copper coil 1/4²
- Immersion circulator
Volume of the tank : 5 l
Heat transfer fluid: Oil
Heating power : 2 kW
- Ejector-compressor
Suction and compression of the refrigerant steam
- Condenser
Glass casing – Copper exchanger
Cooled by water
- A metering pump with variable flow rate
Equipped with nonreturn valves at the suction and discharge
Maximum pressure: 10 bar
Maximum flow rate: 20 l/h
- Evaporator
Glass casing
Cartridge heater with adjustable power
Heating power : 200W
- Evaporator low level detector
ON/OFF level regulation and safety switch for heating cartridge
- Solenoid valve
Regulation of the fluid level in the evaporator
- Machine service valves
The trainer is installed on an aluminum profile structure.
It has an electrical box with a main power disconnect switch and a 30mA differential circuit breaker.
Instrumentation
Three measures of pressure
Ten temperature measurements by thermocouple T type
Evaporator heating cartridge power measurement
Touch screen (7") for displaying the temperatures and the electrical power of the heating cartridge with a synoptic of the installation.
Variable area flowmeter and regulating valve on the condenser water circuit.
- Electrical supply : 230 Vac – 50 Hz – 20 A
- Electrical network : 3 phase(s) + Neutral + Earth.
- Water supply : 4 L/min – 1bars
- Water drain : on the floor
- Dimensions: (LxWxH mm): 1000 x 670 x 650
- weight (Kg): 80